ADU California
|

Project manager

Your AI Project Manager

Your project, organized step by step.

Saved on this device only. Create a free account

Cali's Recommendation

Add your property details

Why: Every other tool here — the cost range, the roadmap, and the assistant — reads from your project profile.

If skipped: Recommendations stay generic instead of reflecting your city and site.

About 5 minutesWho helps: None yet
Add property details

Project status

Property
Not added yet
Project type
Not set
Project goal
Not set
Current stage
Property & Feasibility
Estimated timeline
Most homeowners spend 12–24 months from here
Your timing
Not set
Last activity
No activity yet
Next recommended action
Add your property details
Project readiness score
0%

Daily recommendations

  • Add your property details

    Why it matters: Every other tool here — the cost range, the roadmap, and the assistant — reads from your project profile.

    If skipped: Recommendations stay generic instead of reflecting your city and site.

    About 5 minutesWho helps: None yetAdd property details
  • Review preliminary zoning considerations

    Why it matters: Setbacks, height, lot coverage, and unit size are set locally and shape what is realistic before you spend on design.

    If skipped: You may design something the jurisdiction will not accept and pay to redraw it.

    1–2 hours, plus a call to your planning counterWho helps: Planning staff, later an architect or designerOpen the ADU Guide
  • Estimate project costs as a range

    Why it matters: A planning range keeps design decisions grounded, and lenders and contractors both start from it.

    If skipped: Design and scope grow past what the project can actually support.

    About 10 minutesWho helps: Later, a contractor and a lenderOpen the cost estimator
  • Begin interviewing architects or designers

    Why it matters: Homeowners usually speak with a designer before requesting contractor proposals, so the scope everyone bids on is the same.

    If skipped: Contractor bids end up describing different projects and cannot be compared.

    2–3 conversations over a couple of weeksWho helps: Architect, residential designerGet matched
  • Estimate utility connection costs

    Why it matters: Panel capacity, sewer or septic capacity, and water service are common sources of unbudgeted cost.

    If skipped: A late utility upgrade can move the budget significantly.

    A few calls to your utility providersWho helps: Utility providers, electrician, general contractorConstruction guidance

Today's tasks

0/7 done

Project timeline

  1. Understand the property, your goal, and the local rules that shape what is worth exploring. ADU California does not publish property determinations — local agencies do.

    Common deliverables

    • Written project goal
    • Basic site notes and photos
    • List of questions for planning staff

    Professionals typically involved

    City or county planning staff, Designer or architect (initial consult), Land surveyor

    Potential risks

    • Assuming a rule from another city applies to yours
    • Missing an easement, utility line, or protected tree

Project notes

Questions for your architect, things to discuss with a contractor, ideas, budget thoughts, rental income assumptions. Your assistant can read these when you ask about your project.

  • No notes yet.

Document center

Folders are ready for your project records. Uploads are not available yet — for now, note what you have and where it lives.

  • Property Photos

    Wide shots of the property and street frontage.

  • Site Photos

    The specific area where the work would happen.

  • Architectural Plans

    Concepts, site plans, and permit sets.

  • Engineering

    Structural, civil, soils, and drainage documents.

  • Permits

    Applications, plan check comments, and issued permits.

  • Utility Documents

    Service requests, capacity letters, meters.

  • Contracts

    Proposals, agreements, and change orders.

  • Invoices

    Payment requests and receipts.

  • Inspection Reports

    Inspection cards and correction notices.

  • Personal Notes

    Anything else you want kept with the project.