ADU California
|

Project roadmap

Your project

Project type not set · Stage not set · 0% profile complete

Saved on this device only. Create a free account

  1. 1. Property & Feasibility

    Understand the property, your goal, and the local rules that shape what is worth exploring. ADU California does not publish property determinations — local agencies do.

    • • Write down what the space needs to do for you
    • • Note lot size, existing structures, and site access
    • • Contact your city or county planning department about setbacks, height, size, and parking
  2. 2. Design

    Turn the idea into a documented set that a plan checker and a builder can both read.

    • • Engage a designer or architect
    • • Review the layout against how you'll actually use the space
    • • Confirm the drawing set your jurisdiction expects
  3. 3. Engineering

    Confirm whether structural, civil, or geotechnical engineering is required, and get it documented.

    • • Ask your designer which engineering disciplines apply
    • • Order soils or drainage work if the site calls for it
    • • Coordinate engineering with the architectural set before submitting
  4. 4. Budget & Financing

    Build a range, not a single number, and keep a contingency separate from the construction figure.

    • • Use the cost estimator for a planning range
    • • Separate soft costs from construction costs
    • • Decide how the project would be paid for
  5. 5. Permits

    Submit to your jurisdiction and work through plan check comments.

    • • Submit the plan set to your building department
    • • Track corrections and resubmittals
    • • Confirm utility, school, and impact fee requirements
  6. 6. Contractor Selection

    Compare licensed professionals and written scopes before committing.

    • • Verify licenses directly with CSLB
    • • Get more than one written proposal
    • • Compare scope and exclusions, not only price
  7. 7. Construction

    Construction, coordination, and change management.

    • • Keep a written change-order process
    • • Hold a regular schedule check-in
    • • Document progress with dated photos
  8. 8. Inspections

    Work through required inspection milestones with your building department.

    • • Track required inspection milestones
    • • Keep approved plans on site
    • • Resolve correction notices promptly
  9. 9. Completion

    Close out the permit and get your records in order.

    • • Obtain final inspection sign-off
    • • Collect warranties and as-builts
    • • Update insurance and, if renting, local registration